Updated 2026-11-24

A production board should let the floor and managers know, without making a trip, what each machine is doing now, how much has been made today and where things are stuck. The basic content is five items: machine status (running, waiting, stopped), target vs. actual output, work order progress, utilisation rate and downtime reasons. The numbers on the board should be current, ideally updated automatically by the machines rather than copied by hand.

In a factory, "kanban" has two meanings. One is kanban from the Toyota Production System, a card that travels with the parts so that the upstream process replenishes only what the downstream process has used. The other is the electronic production dashboard or command center board on the wall beside the line or in the office, showing the status of machines and work orders. People searching for "kanban" mean either, so this article covers both, with the emphasis on the electronic production dashboard.

In many factories the board is still a whiteboard: someone writes the target in the morning, someone copies the output every hour, and by the afternoon nobody updates it. Machine 3 stops for half an hour and the manager only finds out by asking in a LINE group. At month end, the utilisation figures on the whiteboard do not match the work orders.

Article Summary | The five items every production board must have and where each comes from; how kanban differs from an electronic production dashboard; how stack lights, andon and the production board relate; a comparison of whiteboards, Excel and automatic machine uploads; the fields for a factory command center board; and how to make a board update automatically from older machines with no network connection.

1. Production Board Content: Five Items You Must Have

Basic content and data sources of a production board
DetailsQuestion it answersWhere the data comes from
Machine status (running, waiting, stopped)Which machines are running and which are idle right nowReported by hand on a walk-through, or judged automatically from the machine's operating signals and counts
Target and actual outputCan today's quota be finishedThe target comes from the schedule; actual output is counted by hand, or counted automatically on every machine cycle
Work order progress and expected completionWhen this order can shipWork order data plus actual output
Utilisation rate (or OEE)How much of the time the machine is really workingRunning and stopped times; manual records often miss small stops of a few minutes
Downtime reasonsWhere it is stuck: changeover, waiting for material, breakdown, waiting for peopleThe machine knows it has stopped, but the reason has to be selected by people on site

The fewer items on the board beside the line, the better; it should be readable while standing in the aisle. Anyone who wants details can click in from the command center or a phone. For the formulas of utilisation rate and OEE and why hand-copied numbers are often inaccurate, see "How to Calculate Utilisation Rate: Formula and How It Differs from OEE".

2. How Kanban Differs from an Electronic Production Dashboard

Comparison of kanban and an electronic production dashboard
KanbanElectronic production dashboard / command center board
What it isA card (or an electronic signal) that travels with parts or materials, stating the item name, quantity, where it comes from and where it goesA screen on the line or in the office, also viewable on a phone, showing the status of machines, work orders and output
What it solvesThe upstream process replenishes only what the downstream process has used, with no overproduction and no stockpilingEveryone sees the same current status, so a stopped machine or a delay is noticed early
OriginThe Toyota Production System's "just-in-time" productionThe same idea as "andon" in the Toyota Production System: when equipment has a problem, a light lets people know
Who uses itProduction planners, materials staff, and between upstream and downstream processesFloor leaders, production planners, plant managers, owners

The two can be used together: kanban decides how much to make and when to replenish materials, and the electronic production dashboard shows whether the machines are working to plan.

3. How Stack Lights, Andon and the Production Board Relate

A machine stack light (also called a tower light or signal light) is mounted above the machine. A common setup is green for running, yellow for standby or warning (for example, out of material or a changeover coming up), and red for a fault stop. The international standard IEC 60204-1 sets the principle for machine indicator colours: red means emergency or danger, yellow means abnormal conditions and green means normal. What each signal means in practice varies between machine makers, so it is best to settle it on site and post it next to the machine.

"Andon" is the Toyota Production System's term: when equipment stops, an abnormality display board lights up to notify everyone, and people only need to step in when there is a problem instead of standing at the machine all the time. The stack light is the most common andon.

The limit of a stack light is that it can only be seen on site: once you walk into the office you cannot see it, and it does not record how long the red light stayed on. What a production dashboard does is bring every machine's "light" onto one screen and record the time of every period of running, waiting and stopped, which is what makes utilisation rate and downtime reasons calculable.

4. Whiteboard, Excel or Automatic Machine Upload: Three Approaches Compared

Comparison of three ways to run a production board
WhiteboardExcel on a projector or shared spreadsheetElectronic board with automatic machine upload
Who updates itA floor leader or operator writes it by hand every hour or every shiftA dedicated person enters or imports itThe machine uploads automatically on every cycle
How currentDepends on how often it is copied; often several hours behindDepends on how often it is enteredCurrent
Whether records are keptGone once erased; you need to take photos or copy it down separatelyYes, but versions tend to differHistory is kept in the cloud, and trends can be checked
Utilisation rate and OEECalculated separatelyCan be calculated; accuracy depends on the inputCalculated automatically
SuitableFew machines, just starting visual managementSomeone is already responsible for reportsMany machines, you want to know downtime reasons, and managers are often not on site
What you need to prepareA whiteboard and markersA computer and a screenA device added to each machine, plus a network on site

A whiteboard is not useless. With only a few machines and a floor leader on the line every day, a whiteboard is the fastest and cheapest. Once there are many machines, a night shift, or managers who are often out visiting customers, a whiteboard cannot keep up.

5. What Fields a Factory Command Center Board Should Show

The board beside the line is for the floor to see its own line; the command center board is for managers to see the whole plant, spot at a glance where the problems are, and then click in for details. Below is the Utilization Fairy command center screen:

The Utilization Fairy command center screen: the top shows total machines, running, waiting, stopped and average utilisation rate, and below is one card per machine
Utilization Fairy command center screen (test data). The top shows total machines, running, waiting, stopped and average utilisation rate; below is one card per machine, showing the work order number, product model, running hours, operator, expected completion, utilisation rate and production progress, with a running, waiting or stopped label at the top right.

Three common layers of a command center board:

  • Plant overview: total number of machines, how many are running, waiting and stopped, and the average utilisation rate.
  • Each machine: status, the work order and product in progress, production progress, expected completion and operator.
  • Click in for more: downtime reasons, historical production records and trend charts, for weekly and monthly review meetings.

A command center does not have to be a room with a video wall. Managers can view the same screen on a phone or tablet and know what is happening in the plant even when travelling or visiting customers.

6. How to Auto-Update a Production Board from Older Machines

Many factories have punch presses, injection moulding machines and packaging machines that have run for over ten years, with no network interface, and replacing them with new ones does not pay. Utilization Fairy is a machine utilisation monitoring system developed in-house by YenProtek that needs no machine modification and can be retrofitted to older machines:

  • A control box with a built-in counter and communication module is added next to the machine, with no line stoppage and no machine modification, and it suits new and old machines of different brands.
  • Every cycle is uploaded to the cloud automatically; the system tallies output, calculates the utilisation rate and can also calculate OEE.
  • Live machine status, production progress, work order information, downtime reason analysis, historical production records and trend charts are on one platform, viewable on a computer, tablet or phone, and can also be shown on a command center electronic board.
  • Machine faults are reported immediately, and the data can be integrated with systems such as MES and ERP.

Implementation example: a stamping plant in Taichung had mostly older machines that could not be networked, of different brands, and wanted to collect the production status and utilisation rate of every machine quickly and without modifying them. YenProtek added control boxes that upload over Wi-Fi to monitor utilisation across the whole plant. See Utilisation Monitoring Case for the Stamping Industry.

Some systems read the machine's stack light signals directly to determine status. If you want to keep using the stack light or other machine signals, please tell us the machine model and the light wiring first, and we will assess the connection method on site. If gauge or meter readings also need to be on the board, Monitor-Fairy can read them automatically with image recognition.

7. Four Things to Settle Before Building a Production Board

  1. Who the board is for: beside the line, for operators and floor leaders, with few items and large text; in the command center, for managers, with the ability to click in for details. Design the two screens separately.
  2. How to classify downtime reasons: start with fewer categories, for example changeover, waiting for material, breakdown, waiting for people and maintenance, run for a month to see which is largest, then refine. If there are too many categories, people on site will stop selecting.
  3. How the network runs: check first whether there is Wi-Fi on site and whether the signal reaches the machines.
  4. Pick one line first: start with the line that has the most downtime or is most often asked about, and expand to the whole plant once the numbers are in and people are used to looking at them.

Send us a machine list or line layout

List the machine types, brands, approximate years and counts, and tell us how the board is updated now and what you most want to know first. We will look at how to install the control boxes and what fields to put on the board. You can also start with one line as a trial. Please leave your details at Contact Us, or call +886-2-7752-3952.

Utilization Fairy Online Quote

Frequently Asked Questions

Q1: What should a production board show?

The basic five: machine status (running, waiting, stopped), target vs. actual output, work order progress with expected completion, utilisation rate (or OEE), and downtime reasons. The fewer items on the board beside the line, the better; leave the details for the command center or a phone.

Q2: What is kanban?

Kanban is a tool of the Toyota Production System's just-in-time production. Cards or electronic signals travel with the parts so that the upstream process replenishes only what the downstream process has used, with no overproduction and no stockpiling. An electronic production dashboard that shows machine status on the wall is a different thing, and the two can be used together.

Q3: What do the colours of a machine stack light mean?

A common setup is green for running, yellow for standby or warning, and red for a fault stop. The indicator colour principles in IEC 60204-1 are red for emergency or danger, yellow for abnormal conditions and green for normal; machine makers do not all use exactly the same settings, so write them down clearly on site.

Q4: What is an andon system?

Andon comes from the Toyota Production System: when equipment stops or something goes wrong, a light signals it, and people go only when there is a problem instead of watching the machine all the time. The stack light on a machine is the most common andon. Bringing every machine's signal onto one screen and recording the times is what an electronic production dashboard does.

Q5: What is the difference between a production dashboard and an MES?

An MES (manufacturing execution system) manages the whole production execution process: dispatching, materials, quality and traceability. A production dashboard is the layer that displays the status, and its data can come from the MES or directly from the machines. For plants that already have an MES, Utilization Fairy data can be integrated into it.

Q6: Can older machines with no network connection get an electronic production dashboard?

Yes. Utilization Fairy adds a control box with a built-in counter and communication module next to the machine, with no line stoppage and no machine modification. Every cycle is uploaded automatically, and the status, output and utilisation rate on the board update by themselves.

Q7: How much does a factory command center cost?

It depends mainly on how many machines to connect, how the site connects to the internet, and whether you need to integrate with existing systems. You can first go to the Utilization Fairy Online Quote and choose the number of machines to see a rough cost; for many machine types or an MES or ERP connection, we will assess on site.

Further Reading

References

  • Toyota Motor Corporation, Toyota Production System (jidoka, andon and just-in-time production).
  • Toyota Motor Europe, Toyota Production System (kanban and just-in-time production).
  • IEC 60204-1, Safety of machinery – Electrical equipment of machines – Part 1: General requirements (indicator colours and meanings).

Article updated: 2026-11-24.